Project highlight | Datacentre campus grounding project

​A large datacentre campus in the Netherlands, with around 15 linked buildings, needed a full lightning protection and grounding system. The challenge was clear: the installation had to meet both American and British standards, which differ from the systems normally used in the Netherlands. At the same time, reliability and uniformity across the whole campus were critical.

Newsletter 2 - Inside DKW, from the field of grounding and lightning protection

In this edition of Inside DKW, we share a technical challenge from the field, highlight a product that adds real value in practice, and introduce one of the people behind our organisation. Short, practical insights from the field of grounding and lightning protection, ready to read in just a few minutes.
 

2025

Nieuwe QR systeem

Het nieuwe QR Systeem
 
De nieuwste ontwikkeling heet het Quick Rig Systeem.  De centrale buis van het mastsysteem is half geopend, zodat de mast na het monteren en stellen van de standaard zijdelings kan worden opgeklapt. Een werkelijke verlichting die tot veel tijdwinst in de montage leidt bij met name hogere masten.
 

2023

Nieuwe QR systeem

Het nieuwe QR Systeem
 
De nieuwste ontwikkeling heet het Quick Rig Systeem.  De centrale buis van het mastsysteem is half geopend, zodat de mast na het monteren en stellen van de standaard zijdelings kan worden opgeklapt. Een werkelijke verlichting die tot veel tijdwinst in de montage leidt bij met name hogere masten.
 

2018

2015

2014